3D modelling of rock slope
To make room for a new double track on the Vestfold line, a steep rock slope close to the existing rail line must be adjusted by blasting. NGI has made a 3D rock model of the rock slope.
![](/globalassets/bilder/prosjekter/3d-modellering-av-fjellskjaring-for-dobbeltsporet-jernbane/eksisterende-bollerudskjaring-med-sikringsnett_2000-1100.jpg?width=3200&quality=80)
![Portrait of Arnstein Aarset](/contentassets/904332d6b866437ab127d5b27619d501/aar.jpg?width=220&quality=80)
![Portrait of Jessica Ka Yi Chiu](/globalassets/bilder/ansattbilder/kyc.jpg?width=220&quality=80)
To make room for a new double track on the Vestfold line, a steep rock slope close to the existing rail line must be adjusted by blasting. NGI has made a 3D rock model of the rock slope.